Assess
Collect the model, symptoms, property details, photos, access notes, and service goals.
Commercial HVAC + Property Management HVAC
Plan and coordinate crane-assisted removal and placement of commercial rooftop HVAC equipment.

Service overview
Plan and coordinate crane-assisted removal and placement of commercial rooftop HVAC equipment. For commercial buildings and managed facilities, the useful scope depends on the installed equipment and the conditions present at the property. Rooftop and packaged equipment combines heating, cooling, airflow, controls, economizer, curb, roof-access, and electrical considerations in a single service scope.
Replacement work should not be treated as a nameplate-only swap. The existing system, building load, distribution, controls, electrical or fuel readiness, access, efficiency goals, and compatible equipment combinations all influence the recommended scope and final commissioning steps.
Service process
Collect the model, symptoms, property details, photos, access notes, and service goals.
Review the commercial rooftop units and define the appropriate replacement path.
Perform the approved work and communicate material findings or changes.
Check operation where applicable and document useful follow-up recommendations.
Match supported indoor and outdoor equipment combinations to AHRI certification records for planning and documentation.
View pageDiagnose condensate drainage, pan, coil, and pump conditions that cause water around an AC system.
View pageService building automation, thermostats, sensors, and HVAC control systems.
View pageDiagnose supported HVAC building-automation alarms, schedules, sensor inputs, and equipment communication issues.
View pageShare the property type, equipment model if available, current symptoms or project goal, photos, access details, and preferred timing. This helps Green Flow route the request and prepare the right next step.
The appropriate first step depends on the equipment and request. Green Flow may begin with equipment identification and an on-site review before confirming repair, maintenance, installation, or replacement scope.
Access, occupants, tenant impact, operating schedules, and site constraints can be discussed during planning so the approved work can be coordinated appropriately.
Popular cities
Try another nearby city or contact GreenFlow to confirm service availability.
Next step
Share the property type, equipment information, service goal, location, and preferred timing so Green Flow can prepare the right next step.